Authorization Object: K_VRGNG
CO: Bus. Trans., Actual Postings And Plan/Act. Allocations
Category: Overhead Cost Orders
Definition
This authorization object protects manual actual cost postings, and
allocations of planned and actual costs, which change the data of a
whole controlling area (or larger areas).
Click on the objects below, to expand data.
Object Fields
The list below includes the object’s fields, ordered by industry-standard importance:
ACTVT | Activity | Filled in 92% of cases |
CO_VRGNG | CO Business Transaction | Filled in 91% of cases |
KOKRS | Controlling Area | Filled in 64% of cases |
Popularity Statistics
Average popularity of K_VRGNG in roles: 2% (What does this mean?)
Average popularity of K_VRGNG by users: 26% (What does this mean?)
Object K_VRGNG is frequently used by users in the following areas:
FI:Financial Accounting
BC:Basis Components
Object K_VRGNG is frequently used in the following business processes:
Internal Order Budget
Sales Order Entry
Environmental Analysis
1. Common authorization objects used with K_VRGNG:
I_ILOA | Change Location- And Accounting Data In The Order | Objects appear together in 98% of cases |
J_JVA_PRC | Joint Venture Accounting: Processing | Objects appear together in 98% of cases |
K_KFPI_DCT | CO: Document Type For Transfer Price Allocations | Objects appear together in 97% of cases |
K_KFPP_DCT | CO: Document Type For Transfer Price Agreements | Objects appear together in 97% of cases |
I_SOGEN | PM: Permit | Objects appear together in 96% of cases |
K_ZBASSL | CO: Calculation Base | Objects appear together in 96% of cases |
K_ZENTSL | CO: Credit | Objects appear together in 96% of cases |
K_ZKALSM | CO: Costing Sheet | Objects appear together in 96% of cases |
V_KONG_VWE | Generate Condition: Usage/Application Authorization | Objects appear together in 96% of cases |
A_IMA_ART | Request Type For Appropriation Requests | Objects appear together in 95% of cases |
A_IMA_BUK | Company Codes For Appropriation Requests | Objects appear together in 95% of cases |
A_IMA_GSB | Business Areas For Appropriation Requests | Objects appear together in 95% of cases |
A_IMA_KOK | Controlling Areas For Appropriation Requests | Objects appear together in 95% of cases |
A_IMA_MSTA | User Status Of Appropriation Requests | Objects appear together in 95% of cases |
A_IMA_REQU | Requesting Area Of Responsibility For Approp. Requests | Objects appear together in 95% of cases |
A_IMA_RESP | Responsible Area Of Responsibility For Approp. Requests | Objects appear together in 95% of cases |
A_IMA_VSTA | User Status For Appropriation Request Variants | Objects appear together in 95% of cases |
A_IMPR_APS | Approval Level For Versions (Program Planning) | Objects appear together in 95% of cases |
A_IMPR_BUK | Company Codes For Investment Program Positions | Objects appear together in 95% of cases |
A_IMPR_GSB | Business Areas For Investment Program Positions | Objects appear together in 95% of cases |
A_IMPR_PRC | Profit Center For Investment Program Positions | Objects appear together in 95% of cases |
A_IMPR_VER | Persons Resp. For Investment Program Positions | Objects appear together in 95% of cases |
G_GB90_ | Validation/Substitution/Rules: Rules | Objects appear together in 95% of cases |
G_GB92_ | Validation/Substitution/Rules: Substitution | Objects appear together in 95% of cases |
I_BETRVORG | PM: Business Operation | Objects appear together in 95% of cases |
I_VORG_ORD | PM: Business Operation For Orders | Objects appear together in 95% of cases |
A_IMPR_KOK | Controlling Areas For Investment Program Positions | Objects appear together in 94% of cases |
A_IMTP_ART | Program Type For Investment Programs | Objects appear together in 94% of cases |
I_AUART | PM: Order Type | Objects appear together in 94% of cases |
K_CKBS | CO-PC: Base Planning Objects | Objects appear together in 94% of cases |
K_CSKS_PLA | CO-CCA: Cost Center Planning | Objects appear together in 94% of cases |
K_ZZUSSL | CO: Overhead | Objects appear together in 94% of cases |
M_MATE_CHG | Material Master: Batches/Trading Units | Objects appear together in 94% of cases |
M_MATE_ZST | Material Master: Change Status Of Batches | Objects appear together in 94% of cases |
Q_STCK_CHG | Change Stock Posting Fields In UD Transactions | Objects appear together in 94% of cases |
Q_UD_CODE | Using Usage Decision Codes | Objects appear together in 94% of cases |
A_PERI_BUK | Asset Accounting: Authorizations For Periodic Processing | Objects appear together in 93% of cases |
K_KEPL_VER | CO-PA Planning: Plan Version | Objects appear together in 93% of cases |
Q_INSP_FIN | Inspection Completion With Open Char./Insp.Pts Req. Conf. | Objects appear together in 93% of cases |
Q_INSPTYPE | Inspection Type For The Insp. Lot | Objects appear together in 93% of cases |
A_B_ANLKL | Asset Postings: Company Code/Asset Class | Objects appear together in 92% of cases |
A_B_BWART | Asset Postings: Asset Class/Transaction Type | Objects appear together in 92% of cases |
C_PRPS_ART | PS: Project Type Authorization For WBS Elements | Objects appear together in 92% of cases |
I_BEGRP | PM: Authorization Group | Objects appear together in 92% of cases |
I_INGRP | PM: Maintenance Planner Group | Objects appear together in 92% of cases |
I_IWERK | PM: Maintenance Planning Plant | Objects appear together in 92% of cases |
I_KOSTL | PM: Cost Centers | Objects appear together in 92% of cases |
I_SWERK | PM: Maintenance Plant | Objects appear together in 92% of cases |
K_KED_UM | Profitability Analysis: Cost Center Assessment | Objects appear together in 92% of cases |
K_KEDT_TC | Profitability Analysis: Transfer Data To CO-PA | Objects appear together in 92% of cases |
K_PVARIANT | Authorization For Screen Variants | Objects appear together in 92% of cases |
P_TCODE | HR: Transaction Codes | Objects appear together in 92% of cases |
Q_GP_CODE | Use Of Group Codes | Objects appear together in 92% of cases |
Q_MATERIAL | Material Authorization | Objects appear together in 92% of cases |
C_PRPS_KOK | PS: Controlling Area Authorization For WBS Elements | Objects appear together in 91% of cases |
C_PRPS_KST | PS: Cost Center Authorization For WBS Elements | Objects appear together in 91% of cases |
C_PRPS_PRC | PS: Profit Center Authorization For WBS Elements | Objects appear together in 91% of cases |
C_PRPS_VNR | PS: Project Manager Authorization For WBS Elements | Objects appear together in 91% of cases |
I_QMEL | PM/QM: Notification Types | Objects appear together in 91% of cases |
K_CSKB_PLA | CO-CCA: Cost Element Planning | Objects appear together in 91% of cases |
K_TKA50 | CO: Planner Profiles | Objects appear together in 91% of cases |
M_IS_WERKS | LIS Standard Analysis: Info Structure / Plant | Objects appear together in 91% of cases |
Q_TCODE | QM Transaction Authorization | Objects appear together in 91% of cases |
K_CSLA | CO-CCA: Activity Types Master | Objects appear together in 90% of cases |
B_USERSTAT | Status Management: Set/Delete User Status | Objects appear together in 89% of cases |
C_PROJ_TCD | PS: Transaction-Specific Authorizations In Project System | Objects appear together in 89% of cases |
M_IS_KENNZ | LIS Standard Analysis: Info Structure / Key Figure | Objects appear together in 89% of cases |
C_TCLS_BER | Authorization For Org. Areas In Classification System | Objects appear together in 88% of cases |
C_TCLS_MNT | Authorization For Characteristics Of Org. Area | Objects appear together in 88% of cases |
I_TCODE | PM: Transaction Code | Objects appear together in 88% of cases |
M_INFO_ANL | Info Structure: Application | Objects appear together in 88% of cases |
K_CKPH | CO-PC: Cost Objects | Objects appear together in 87% of cases |
K_KA09_KVS | CO: Version | Objects appear together in 86% of cases |
S_APPL_LOG | Applications Log | Objects appear together in 86% of cases |
F_BKPF_BUK | Accounting Document: Authorization For Company Codes | Objects appear together in 85% of cases |
C_TCLA_BKA | Authorization For Class Types | Objects appear together in 82% of cases |
S_RFC | Authorization Check For RFC Access | Objects appear together in 68% of cases |
K_KA_RPT | CO: Interactive Drilldown Reporting – Reports | Objects appear together in 66% of cases |
K_KC_FC | EC-EIS: Function Code Authorization | Objects appear together in 66% of cases |
PLOG | Personnel Planning | Objects appear together in 66% of cases |
S_BTCH_ADM | Background Processing: Background Administrator | Objects appear together in 65% of cases |
S_BTCH_JOB | Background Processing: Operations On Background Jobs | Objects appear together in 65% of cases |
K_CSKS_SET | CO-CCA: Cost Center Groups | Objects appear together in 64% of cases |
K_KEA_ERG | Profitability Analysis: Set Operating Concern | Objects appear together in 64% of cases |
S_TABU_CLI | Cross-Client Table Maintenance | Objects appear together in 64% of cases |
S_BDS_DS | BC-SRV-KPR-BDS: Authorizations For Document Set | Objects appear together in 63% of cases |
S_TABU_DIS | Table Maintenance (Via Standard Tools Such As SM30) | Objects appear together in 58% of cases |
K_REPO_OPA | CO-OPA: Reporting On Orders | Objects appear together in 55% of cases |
K_TP_VALU | Transfer Price Valuations | Objects appear together in 55% of cases |
K_CCA | CO-CCA: Gen. Authorization Object For Cost Center Accounting | Objects appear together in 54% of cases |
S_SCD0 | Change Documents | Objects appear together in 45% of cases |
K_AUFK_ART | CO-OPA: Order Types | Objects appear together in 41% of cases |
K_ORDER | CO-OPA: General Authorization Object For Internal Orders | Objects appear together in 33% of cases |
S_ALV_LAYO | ALV Standard Layout | Objects appear together in 33% of cases |
2. Appearance of K_VRGNG in T-Codes:
ACTL | INTERNAL: Work List | Used in 100% of cases |
AIAZ | Display Dist. Rule Allocation | Used in 100% of cases |
CJ46 | Plnd ovrhd: Projects, ind. process. | Used in 100% of cases |
CJ70 | Maintain Project Settlement LIs | Used in 100% of cases |
CJ7N | Maint. DRG inv.projects for retmt. | Used in 100% of cases |
CJ8A | Act.-setlmt: Proj. retirmt. from IM | Used in 100% of cases |
CJG1 | Enter Transfer Price Allocation | Used in 100% of cases |
CJJ2 | Change Statistical Key Figures | Used in 100% of cases |
CJJ3 | Display Statistical Key Figures | Used in 100% of cases |
CJP1 | Create Project Plan Adjustment | Used in 100% of cases |
CJP2 | Change Project Plan Adjustment | Used in 100% of cases |
CJP3 | Display Project Plan Adjustment | Used in 100% of cases |
CJPU | Execute Project Plan Adjustment | Used in 100% of cases |
CJZ3 | Plan Int.Calc.: Project Indiv.Prc. | Used in 100% of cases |
CPC1 | Create Actual Indirect Acty Alloc. | Used in 100% of cases |
CPC2 | Change Actual Indirect Acty Alloc. | Used in 100% of cases |
CPC3 | Display Actual Indirect Acty Alloc. | Used in 100% of cases |
CPC4 | Delete Actual Indirect Acty Alloc. | Used in 100% of cases |
CPC6 | Overview actual ind. activity alloc. | Used in 100% of cases |
CPC7 | Create Indirect Activity Alloc. Plan | Used in 100% of cases |
CPC8 | Change Indirect Activity Alloc. Plan | Used in 100% of cases |
CPC9 | Display Indirect Acty Alloc. Plan | Used in 100% of cases |
CPCA | Delete Indirect Activity Alloc. Plan | Used in 100% of cases |
CPCC | Indirect Acty Alloc. Plan: Overview | Used in 100% of cases |
CPCCN | Indirect Acty Alloc. Plan: Overview | Used in 100% of cases |
CPI1 | Enter Statistical Key Figures | Used in 100% of cases |
CPP1 | Create Actual Assess. for Processes | Used in 100% of cases |
CPP2 | Change Actual Assess. for Processes | Used in 100% of cases |
CPP3 | Display Actual Assess.for Processes | Used in 100% of cases |
CPP4 | Delete Actual Assess. for Processes | Used in 100% of cases |
CPP6 | Actual Assess. Processes: Overview | Used in 100% of cases |
CPP6N | Actual Assess. Processes: Overview | Used in 100% of cases |
CPP7 | Create Plan Assess. for Processes | Used in 100% of cases |
CPP8 | Change Plan Assess. for Processes | Used in 100% of cases |
CPP9 | Display Plan Assess. for Processes | Used in 100% of cases |
CPPA | Delete Plan Assessment for Processes | Used in 100% of cases |
CPPC | Plan Assess. for Processes: Overview | Used in 100% of cases |
CPPCN | Plan Assess. for Processes: Overview | Used in 100% of cases |
CPSP | Split Plan Costs | Used in 100% of cases |
CPUK | Plan Template Allocation: Project | Used in 100% of cases |
CPV1 | Create Actual Process Distribution | Used in 100% of cases |
CPV2 | Change Actual Distribution Process | Used in 100% of cases |
CPV3 | Display Actual Process Distribution | Used in 100% of cases |
CPV4 | Delete Actual Process Distribution | Used in 100% of cases |
CPV6 | Actual Process Distribution Overview | Used in 100% of cases |
CPV6N | Actual Process Distribution Overview | Used in 100% of cases |
CPV7 | Create Plan Process Distribution | Used in 100% of cases |
CPV8 | Change Plan Process Distribution | Used in 100% of cases |
CPV9 | Display Plan Process Distribution | Used in 100% of cases |
CPVA | Delete Plan Process Distribution | Used in 100% of cases |
CPVC | Plan Process Distribution Overview | Used in 100% of cases |
CPVCN | Plan Process Distribution Overview | Used in 100% of cases |
FO3C | Real estate CO settlement | Used in 100% of cases |
GJF1 | Create JV assessment cycle – actual | Used in 100% of cases |
GJF2 | Change JV assessment cycle – actual | Used in 100% of cases |
GJF3 | Display JV assessment cycle – actual | Used in 100% of cases |
GJF4 | Delete JV assessment cycle – actual | Used in 100% of cases |
GJF5 | Execute JV assessment – actual | Used in 100% of cases |
GJG1 | Create JV distribution cycle -actual | Used in 100% of cases |
GJG2 | Change JV distribution cycle -actual | Used in 100% of cases |
GJG3 | Display JV distribution cycle-actual | Used in 100% of cases |
GJG4 | Delete JV distribution cycle -actual | Used in 100% of cases |
GJG5 | Execute JV distribution – actual | Used in 100% of cases |
GJG6 | Overview distribution – actual | Used in 100% of cases |
GJG7 | Create JV distribution cycle -plan | Used in 100% of cases |
IM40 | Change supplement on operative objs | Used in 100% of cases |
IM41 | Display suppmt on operative objects | Used in 100% of cases |
IM42 | Change budget operative objects | Used in 100% of cases |
IM43 | Display budget operative objects | Used in 100% of cases |
IM48 | Change return on operative objects | Used in 100% of cases |
IM49 | Display return on operative objects | Used in 100% of cases |
IMCCP2 | Transfer App.Req. Plan -> Meas. Plan | Used in 100% of cases |
IMPBA4 | Plan/Budget Adjustment (Orders) | Used in 100% of cases |
IW81 | Create Refurbishment Order | Used in 100% of cases |
JBDFTP | FTP Update in PC Accounting | Used in 100% of cases |
KAFD | External Data Transfer | Used in 100% of cases |
KAFL | Delete All Costs Transferred w. KAFD | Used in 100% of cases |
KALF | Start Background Report RKAKALBT | Used in 100% of cases |
KB11 | Enter Reposting of Primary Costs | Used in 100% of cases |
KB14 | Reverse Reposting of Primary Costs | Used in 100% of cases |
KB15 | Enter Manual Allocations | Used in 100% of cases |
KB17 | Reverse Manual Allocations | Used in 100% of cases |
KB21 | Enter Activity Allocation | Used in 100% of cases |
KB22 | IAA via Internet | Used in 100% of cases |
KB23 | Display Activity Allocation | Used in 100% of cases |
KB24 | Reverse Activity Allocation | Used in 100% of cases |
KB27 | IAA Enter Other Periods | Used in 100% of cases |
KB31 | Enter Statistical Key Figures | Used in 100% of cases |
KB33 | Display Statistical Key Figures | Used in 100% of cases |
KB34 | Reverse Statistical Key Figures | Used in 100% of cases |
KB41 | Enter Reposting of Revenues | Used in 100% of cases |
KB43 | Display Reposting of Revenues | Used in 100% of cases |
KB44 | Reverse Reposting of Revenues | Used in 100% of cases |
KB71 | JV-Transfer Postings | Used in 100% of cases |
KIS6 | Segment Adjustment: Overview | Used in 100% of cases |
KIS6N | Segment Adjustment: Overview | Used in 100% of cases |
KISR | Execute Actual Segment Adjustment | Used in 100% of cases |
KKA3P | Sales Document Item Results Analysis | Used in 100% of cases |
KKA5 | Create RA Data for WBS Element | Used in 100% of cases |
KKA7P | Delete Results Anal. Data for Order | Used in 100% of cases |
KKA8 | Delete RA Data for WBS Element | Used in 100% of cases |
KKA8P | Delete RA Data for WBS Element | Used in 100% of cases |
KKA9P | Delete RA Data for Sales Order | Used in 100% of cases |
KKAG | WIP: Display Worklist | Used in 100% of cases |
KKAKP | Plan Results Analysis: Sales Orders | Used in 100% of cases |
KKG2 | Create Cost of Sales: Project | Used in 100% of cases |
KKP1 | Create Hierarchy Master Record | Used in 100% of cases |
KKP2 | Change Hierarchy Master Record | Used in 100% of cases |
KKP3 | Display Hierarchy Master Record | Used in 100% of cases |
KKS1N | Variances – Product Cost by Lot (C) | Used in 100% of cases |
KKS3 | Scrap – Product Cost by Lot (C) | Used in 100% of cases |
KKS4 | Scrap – Product Cost by Lot (I) | Used in 100% of cases |
KKS7 | Scrap – Product Cost by Period (C) | Used in 100% of cases |
KKS8 | Scrap – Product Cost by Period (I) | Used in 100% of cases |
KKSP | Variances – Engineer-to-Order (C) | Used in 100% of cases |
KKSQ | Variances – Engineer-to-Order (I) | Used in 100% of cases |
KKSR | Scrap – Engineer-to-Order (C) | Used in 100% of cases |
KKSS | Scrap – Engineer-to-Order (I) | Used in 100% of cases |
KKST | Variances – Cost by Sales Order (C) | Used in 100% of cases |
KKSU | Variances – Cost by Sales Order (I) | Used in 100% of cases |
KKSV | Scrap – Cost by Sales Order (C) | Used in 100% of cases |
KKSW | Scrap – Cost by Sales Order (I) | Used in 100% of cases |
KO8A | Act.-setlmt: Order retmt. from IM | Used in 100% of cases |
KOB6 | Order: Act. amt. line item settlmt. | Used in 100% of cases |
KOB7 | Line item sel. inv.meas. for retmt. | Used in 100% of cases |
KOM1 | Create CO model order | Used in 100% of cases |
KOM3 | Display CO model order | Used in 100% of cases |
KOPU | Execute Orders for Plan Revaluation | Used in 100% of cases |
KOSRLIST | Collective Displ.: Settlement Rules | Used in 100% of cases |
KOSRLIST_PP | Prod. Orders: Coll. Displ. SettRules | Used in 100% of cases |
KOSRLIST_PR | Projects/Nets: Coll. Displ.SettRules | Used in 100% of cases |
KOSRLIST_RE | Real Estate: Coll. Displ. Sett.Rules | Used in 100% of cases |
KOSRLIST_VB | Sales Doc.: Coll. Displ. Sett. Rules | Used in 100% of cases |
KOW2 | Change Periodic Reposting | Used in 100% of cases |
KOW3 | Display Periodic Reposting | Used in 100% of cases |
KPUB | Revaluate Plan in Background | Used in 100% of cases |
KSA4 | Execute actual accrual | Used in 100% of cases |
KSA9 | Execute Plan Accrual | Used in 100% of cases |
KSAI | Accrual Calc.: Maintain Actual Data | Used in 100% of cases |
KSAP | Accrual Calc.: Maintain Plan Data | Used in 100% of cases |
KSC6 | Act. Indirect Acty Alloc.: Overview | Used in 100% of cases |
KSC6N | Act. Indirect Acty Alloc.: Overview | Used in 100% of cases |
KSCC | Indirect Acty Alloc. Plan: Overview | Used in 100% of cases |
KSCCN | Indirect Acty Alloc. Plan: Overview | Used in 100% of cases |
KSOV | Cycle Maintenance/Overview (CCA,ABC) | Used in 100% of cases |
KSS3 | Calculate Target Costs | Used in 100% of cases |
KSU2N | Change Actual Assessment | Used in 100% of cases |
KSU6 | Actual Assessment: Overview | Used in 100% of cases |
KSU6N | Actual Assessment: Overview | Used in 100% of cases |
KSUC | Plan Assessment: Overview | Used in 100% of cases |
KSUCN | Plan Assessment: Overview | Used in 100% of cases |
KSV2N | Change Actual Distribution | Used in 100% of cases |
KSV6 | Actual Distribution: Overview | Used in 100% of cases |
KSV6N | Actual Distribution: Overview | Used in 100% of cases |
KSVC | Plan Distribution: Overview | Used in 100% of cases |
KSVCN | Plan Distribution: Overview | Used in 100% of cases |
KSW6 | Periodic Repostings: Overview | Used in 100% of cases |
KSW6N | Periodic Repostings: Overview | Used in 100% of cases |
KSWC | Plan Periodic Repostings: Overview | Used in 100% of cases |
KSWCN | Plan Periodic Repostings: Overview | Used in 100% of cases |
KVA1 | Display Plan Assignment CCtr/KF | Used in 100% of cases |
KVA3 | Display Actual Assignment CCtr/KF | Used in 100% of cases |
KVA6 | Copy Assignment CCtr/KF | Used in 100% of cases |
KVB0 | Maintain Plan Assignment Process/KF | Used in 100% of cases |
KVB1 | Display Plan Assignment Process/KF | Used in 100% of cases |
KVB2 | Change Actual Assignment Process/KF | Used in 100% of cases |
KVB3 | Display Actual Assignment Process/KF | Used in 100% of cases |
KVB6 | Copy Assignment Processes/KF | Used in 100% of cases |
KVC0 | Change Plan Assignment CObj/KF | Used in 100% of cases |
KVC1 | Display Plan Assignment CObj/KF | Used in 100% of cases |
KVC2 | Change Actual Assignment CObj/KF | Used in 100% of cases |
KVC3 | Display Actual Assignment CObj/KF | Used in 100% of cases |
KVC6 | Copy Assignment Cost Object/Key Fig. | Used in 100% of cases |
KVD1 | Display Plan Assignment ATyp/KF | Used in 100% of cases |
KVD3 | Display Actual Assignment ATyp/KF | Used in 100% of cases |
KVD6 | Copy Assignment ActType/Key Figure | Used in 100% of cases |
KZB2 | Maintain Calculation Base | Used in 100% of cases |
KZE2 | Maintain Credit | Used in 100% of cases |
KZM2 | Maintain quantity-based overhead | Used in 100% of cases |
KZS2 | Maintain Costing Sheet | Used in 100% of cases |
MFN2 | Actual Reval.: PrCstCol. Col.Pro. | Used in 100% of cases |
OKEW | Splitting: Assignment KOSTL -> SCNAM | Used in 100% of cases |
PSWB | Execute Per.Reposting Plan Projects | Used in 100% of cases |
AR13 | Call Up Prim. Cost Plan. Dep./Int. | Used in 99% of cases |
BATCHMAN | Transfer of External CO Data | Used in 99% of cases |
CJ44 | Act. overhd: Projects, ind. process. | Used in 99% of cases |
CJ47 | Pld Overhead: Projects, Coll.Procssg | Used in 99% of cases |
CJ7E | Plan Settlement: Projects | Used in 99% of cases |
CJ7G | Plan Settlement: Projects | Used in 99% of cases |
CJ88 | Settle Projects and Networks | Used in 99% of cases |
CJ9E | Plan Settlement: Projects | Used in 99% of cases |
CJA1 | Proj.Rel.Order Receipts: Coll.Proc. | Used in 99% of cases |
CJA2 | Proj.Rel. Order Receipts: Ind.Proc. | Used in 99% of cases |
CJBV | Activate Project Availabilty Control | Used in 99% of cases |
CJBW | Deactivate Project Availabilty Cntrl | Used in 99% of cases |
CJCF | Carry Forward Project Commitments | Used in 99% of cases |
CJF1 | Create Transfer Price Agreement | Used in 99% of cases |
CJF2 | Change Transfer Price Agreement | Used in 99% of cases |
CJF3 | Display Transfer Price Agreement | Used in 99% of cases |
CJF4 | Transfer Price Agreement List | Used in 99% of cases |
CJG3 | Display Transfer Price Allocation | Used in 99% of cases |
CJG4 | Enter Trsfr Price Allocation: List | Used in 99% of cases |
CJG5 | Cancel Transfer Price Allocation | Used in 99% of cases |
CJK2 | Change Statistical Key Figures | Used in 99% of cases |
CJK3 | Display Statistical Key Figures | Used in 99% of cases |
CJN1 | Reval. ACT: Projects Ind.Pro. | Used in 99% of cases |
CJN2 | Reval. ACT: Projects Col.Pro. | Used in 99% of cases |
CJO8 | Overhead COMM: Projects Ind.Pro. | Used in 99% of cases |
CJO9 | Overhead COMM: Projects Col.Pro. | Used in 99% of cases |
CJZ1 | Act. Int Calc.: Projects Coll. Proc. | Used in 99% of cases |
CJZ2 | Actual Int.Calc.: Project Indiv.Prc. | Used in 99% of cases |
CJZ5 | Plan Int.Calc.: Project Coll.Prc. | Used in 99% of cases |
CJZ6 | Actual Int.Calc.: Indiv.CO Order Prc | Used in 99% of cases |
CJZ7 | Planned Int.Calc: Indiv.CO Ord.Proc. | Used in 99% of cases |
CJZ8 | Actual Int.Calc.: Coll.CO Order Prc. | Used in 99% of cases |
CJZ9 | Plan Int.Calc.: Coll.CO Order Prc. | Used in 99% of cases |
CKMDUVACT | Distribution of Activity Differences | Used in 99% of cases |
CPAE | Actl. Template Alloc: Prof. Analysis | Used in 99% of cases |
CPAS | Actual Template Alloc.: Bus. Process | Used in 99% of cases |
CPC5 | Execute Actual Indirect Acty Alloc. | Used in 99% of cases |
CPCB | Execute Plan Indirect Acty Alloc. | Used in 99% of cases |
CPFX | Pre-distribute Fixed Costs: Process | Used in 99% of cases |
CPII | Price calc. in actl: process | Used in 99% of cases |
CPMA | Target=Actual-IAA: process | Used in 99% of cases |
CPMB | ABC: Plan Reconciliation | Used in 99% of cases |
CPP5 | Execute Actual Assess.for Processes | Used in 99% of cases |
CPPB | Execute Plan Assess. for Processes | Used in 99% of cases |
CPPE | Plan Templ. Alloc.: Results Analysis | Used in 99% of cases |
CPPI | Iter. plan act. price calc. (CO-ABC) | Used in 99% of cases |
CPPS | Plan Template Allocation: Process | Used in 99% of cases |
CPS1 | Variance Calculation: Processes | Used in 99% of cases |
CPS2 | Actual Cost Splitting: Processes | Used in 99% of cases |
CPTK | Actual Template Allocation: Project | Used in 99% of cases |
CPTL | Actual Template Allocation: Projects | Used in 99% of cases |
CPUA | Plan Template Allocation: Order | Used in 99% of cases |
CPUB | Plan Template Allocation: Orders | Used in 99% of cases |
CPUL | Plan Template Allocation: Projects | Used in 99% of cases |
CPV5 | Execute Actual Process Distribution | Used in 99% of cases |
CPVB | Execute Plan Process Distribution | Used in 99% of cases |
CPZI | Actual overhead calc.: process | Used in 99% of cases |
CPZP | Plan Overhead: Business Processes | Used in 99% of cases |
IM52 | Process budget distribution | Used in 99% of cases |
IM53 | Display budget distribution | Used in 99% of cases |
IMC0 | IM Summarization: Execute Report | Used in 99% of cases |
IMCCP4 | Copy Plan -> Budget (Orders) | Used in 99% of cases |
IMCOC4 | Consistency Check (Orders) | Used in 99% of cases |
IMCRC4 | Currency Recalculation (Orders) | Used in 99% of cases |
IW36 | Create PM Sub-Order | Used in 99% of cases |
JBKW | Actual Process Allocation: Fin. Obj. | Used in 99% of cases |
KAL1 | Reconcil. Ledger follow-up posting | Used in 99% of cases |
KALC | Cost Flow Message | Used in 99% of cases |
KALD | Reset Reconciliation Ledger | Used in 99% of cases |
KALH | Change Rules for Reconcil. Posting | Used in 99% of cases |
KALK | Create Rules for Reconcil. Posting | Used in 99% of cases |
KALS | Reverse Reconciliation Posting | Used in 99% of cases |
KALX | Fill Original Units in CO Document | Used in 99% of cases |
KALY | Convert Reconc. Ledger Documents | Used in 99% of cases |
KB51 | Enter Activity Posting | Used in 99% of cases |
KB51N | Enter Sender Activities | Used in 99% of cases |
KB53 | Display Activity Posting | Used in 99% of cases |
KB53N | Display Sender Activities | Used in 99% of cases |
KB54 | Reverse Activity Posting | Used in 99% of cases |
KB54N | Reverse Sender Activities | Used in 99% of cases |
KEG5 | Execute Indirect Actual Acty Alloc. | Used in 99% of cases |
KEGB | Execute Indirect Plan Acty Alloc. | Used in 99% of cases |
KGO2 | Overhead Commt: Int.Orders Ind.Pro. | Used in 99% of cases |
KGO4 | Overhead Commt: Int.Orders Col.Pro. | Used in 99% of cases |
KGP2 | Overhead Plan.: Int.Orders Ind.Pro. | Used in 99% of cases |
KGP4 | Overhead Plan.: Int.Orders Col.Pro. | Used in 99% of cases |
KKA1P | Order Results Analysis and WIP Calc. | Used in 99% of cases |
KKA2 | Project Results Anal. and WIP Calc. | Used in 99% of cases |
KKA2P | Project Results Anal. and WIP Calc. | Used in 99% of cases |
KKA3 | Sales Document Item Results Analysis | Used in 99% of cases |
KKA4 | Create Res. Analysis Data for Order | Used in 99% of cases |
KKA6 | Create RA Data for Sales Order | Used in 99% of cases |
KKA7 | Delete Results Anal. Data for Order | Used in 99% of cases |
KKA9 | Delete RA Data for Sales Order | Used in 99% of cases |
KKAIP | Planned Results Analysis: Orders | Used in 99% of cases |
KKAJP | Plan Results Analysis: WBS Elements | Used in 99% of cases |
KKAT | WIP Display for Product Cost Coll. | Used in 99% of cases |
KKAV | WIP Calculation for Cost Object Hier | Used in 99% of cases |
KKAW | WIP Display Cost Object Hierarchy | Used in 99% of cases |
KKAX | WIP Calculation for Order | Used in 99% of cases |
KKAY | WIP Display for Order | Used in 99% of cases |
KKC1 | Create Cost Object | Used in 99% of cases |
KKC2 | Change Cost Object | Used in 99% of cases |
KKC3 | Display Cost Object | Used in 99% of cases |
KKF1 | Create CO Production Order | Used in 99% of cases |
KKF4 | Change CO-FA Plan Values | Used in 99% of cases |
KKF5 | Display CO-FA Plan Values | Used in 99% of cases |
KKG3 | Create Cost of Sales: Sales Order | Used in 99% of cases |
KKP5 | Cost ObjHier: Indiv. Proc. Variances | Used in 99% of cases |
KKPHIE | Cost Object Hierarchy | Used in 99% of cases |
KKPT | Cost Obj Hier: Coll. Proc. Variances | Used in 99% of cases |
KKPX | Actual Cost Distribution: Cost Obj. | Used in 99% of cases |
KKPY | Actual Cost Distribution: Cost Obj. | Used in 99% of cases |
KKS2 | Variances – Product Cost by Lot (I) | Used in 99% of cases |
KNMA | Target=Actual-IAA: cost centers | Used in 99% of cases |
KO24 | Change Order Supplement | Used in 99% of cases |
KO25 | Display Order Supplement | Used in 99% of cases |
KO26 | Change Order Return | Used in 99% of cases |
KO27 | Display Order Return | Used in 99% of cases |
KO30 | Activate Orders Availability Control | Used in 99% of cases |
KO32 | Deactivate Order Availability Cntrl | Used in 99% of cases |
KO9E | Plan Settlement: Internal Order | Used in 99% of cases |
KOCF | Carry Forward Order Commitments | Used in 99% of cases |
KOCO | Budget Carryforward for Orders | Used in 99% of cases |
KOM2 | Change CO Model Order | Used in 99% of cases |
KOW1 | Create Periodic Reposting | Used in 99% of cases |
KPAS | Actl. Templ.-Alloc.: CCTR/Acty Type | Used in 99% of cases |
KPPS | Allocation Templ. Plan: CCtr/ATyp | Used in 99% of cases |
KPU1 | Create Plan Revaluation | Used in 99% of cases |
KSA3 | Actual Accrual for Cost Centers | Used in 99% of cases |
KSA8 | Plan Accrual for Cost Centers | Used in 99% of cases |
KSAJ | Accrual Calc.: Maintain Tgt=Act Cred | Used in 99% of cases |
KSAZ | Accrual: Maintain Overhead Structure | Used in 99% of cases |
KSC1 | Create Actual Indirect Acty Alloc. | Used in 99% of cases |
KSC2 | Change Actual Indirect Acty Alloc. | Used in 99% of cases |
KSC3 | Display Actual Indirect Acty Alloc. | Used in 99% of cases |
KSC4 | Delete Actual Indirect Acty Alloc. | Used in 99% of cases |
KSC5 | Execute Actual Indirect Acty Alloc. | Used in 99% of cases |
KSC7 | Create Indirect Activity Alloc. Plan | Used in 99% of cases |
KSC8 | Change Indirect Activity Alloc. Plan | Used in 99% of cases |
KSC9 | Display Indirect Acty Alloc. Plan | Used in 99% of cases |
KSCA | Delete Indirect Activity Alloc. Plan | Used in 99% of cases |
KSCB | Execute Plan Indirect Acty Alloc. | Used in 99% of cases |
KSCF | Carry Forward Cost Center Commitment | Used in 99% of cases |
KSFX | Predistribute fixed costs: cctr | Used in 99% of cases |
KSI4 | Actual Overhead: Cost Centers | Used in 99% of cases |
KSII | Actual Price Determination: CCtrs | Used in 99% of cases |
KSO9 | Commitment Overhead: Cost Centers | Used in 99% of cases |
KSP4 | Plan Overhead: Cost Centers | Used in 99% of cases |
KSPU | Execute Plan Revaluation | Used in 99% of cases |
KSS1 | Variance Calculation: Cost Centers | Used in 99% of cases |
KSS2 | Actual Cost Splitting: Cost Centers | Used in 99% of cases |
KSS4 | Split Plan Costs | Used in 99% of cases |
KSU4 | Delete Actual Assessment | Used in 99% of cases |
KSUA | Delete Plan Assessment | Used in 99% of cases |
KSV1 | Create Actual Distribution | Used in 99% of cases |
KSV2 | Change Actual Distribution | Used in 99% of cases |
KSV3 | Display Actual Distribution | Used in 99% of cases |
KSV4 | Delete Actual Distribution | Used in 99% of cases |
KSV5 | Execute Actual Distribution | Used in 99% of cases |
KSV7 | Create Plan Distribution | Used in 99% of cases |
KSV8 | Change Plan Distribution | Used in 99% of cases |
KSV9 | Display Plan Distribution | Used in 99% of cases |
KSVA | Delete Plan Distribution | Used in 99% of cases |
KSVB | Execute Plan Distribution | Used in 99% of cases |
KSW1 | Create Periodic Reposting | Used in 99% of cases |
KSW2 | Change Periodic Reposting | Used in 99% of cases |
KSW3 | Display Periodic Reposting | Used in 99% of cases |
KSW4 | Delete Periodic Reposting | Used in 99% of cases |
KSW7 | Create Plan Periodic Reposting | Used in 99% of cases |
KSW8 | Change Plan Periodic Reposting | Used in 99% of cases |
KSW9 | Display Plan Periodic Reposting | Used in 99% of cases |
KSWA | Delete Plan Periodic Reposting | Used in 99% of cases |
KVA0 | Maintain Assignment Cost Ctr./KF | Used in 99% of cases |
KVA2 | Maintain Actual Assignment CCtr/KF | Used in 99% of cases |
KVA4 | Transfer Plan Statistical Key Figure | Used in 99% of cases |
KVA5 | Transfer Actual Stat. Key Figure | Used in 99% of cases |
KVB4 | PROZ: Copy Plan Stat. Key Figures | Used in 99% of cases |
KVB5 | PROZ: Copy Actual Stat. Key Figures | Used in 99% of cases |
KVC4 | KSRTG: Copy Plan Stat. Key Figures | Used in 99% of cases |
KVC5 | KSRTG: Copy Actual Stat. Key Figures | Used in 99% of cases |
KVD0 | Maintain Plan Assignment ATyp/KF | Used in 99% of cases |
KVD2 | Change Actual Assignment ATyp/KF | Used in 99% of cases |
KVD4 | LSTAR: Copy Plan Stat. Key Figures | Used in 99% of cases |
KVD5 | LSTAR: Copy Actual Stat. Key Figures | Used in 99% of cases |
KZA1 | Select Overhead | Used in 99% of cases |
MFN1 | Actual Reval.: PrCstCol. Ind.Pro. | Used in 99% of cases |
OK17 | Reconciliation Ledger: Acct Determ. | Used in 99% of cases |
OKOZ | Maintain Overhead Tables | Used in 99% of cases |
PSW5 | Per.Repostgs in Actual for Projects | Used in 99% of cases |
S_ALR_87008275 | IMG Activity: SIMG_ORKK_WERK_KZZ2 | Used in 99% of cases |
VACF | Commit. carried forwrd: Sales orders | Used in 99% of cases |
AIAB | AuC Assignment of Dist. Rule | Used in 98% of cases |
CJ45 | Act. ovhd: Projects, coll. process. | Used in 98% of cases |
CJ8G | Actual Settlement: Projects/Networks | Used in 98% of cases |
CJ9G | Plan Settlement: Projects | Used in 98% of cases |
CO42 | Act. Overhead: Prod.Ordr Ind.Pro. | Used in 98% of cases |
CO8A | Presett. Co-Products, Postprocessing | Used in 98% of cases |
CO8B | Presett. Co-Products, Postprocessing | Used in 98% of cases |
CON1 | Actual Reval.: Prod.Ordr Ind.Pro. | Used in 98% of cases |
CON2 | Actual Reval.: Prod.Ordr Col.Pro. | Used in 98% of cases |
CPTB | Actual Template Allocation: Orders | Used in 98% of cases |
CPTD | Actual Template Alloc.: Prod. Orders | Used in 98% of cases |
CPTE | Actual Template Alloc.: Run Sched. | Used in 98% of cases |
CPTG | Actual Templ. Allocation: Cost Obj. | Used in 98% of cases |
CPTH | Actual Templ. Allocation: Cost Obj. | Used in 98% of cases |
CPTJ | Actl Template Alloc.: Cust. Orders | Used in 98% of cases |
IW31 | Create Order | Used in 98% of cases |
IW32 | CHANGE ORDER | Used in 98% of cases |
IW33 | Display PM Order | Used in 98% of cases |
IW34 | PM Order for PM Notification | Used in 98% of cases |
KB13 | Display Reposting of Primary Costs | Used in 98% of cases |
KB14N | Reverse Manual Repostings of Costs | Used in 98% of cases |
KB16 | Display Manual Allocations | Used in 98% of cases |
KB17N | Reverse Manual Allocations | Used in 98% of cases |
KB21N | Enter Direct Activity Allocation | Used in 98% of cases |
KB23N | Display Direct Activity Allocation | Used in 98% of cases |
KB24N | Reverse Direct Activity Allocation | Used in 98% of cases |
KB33N | Display Statistical Key Figures | Used in 98% of cases |
KB34N | Reverse Statistical Key Figures | Used in 98% of cases |
KB41N | Enter Manual Repostings of Revenue | Used in 98% of cases |
KB43N | Display Manual Repostings of Revenue | Used in 98% of cases |
KB44N | Reverse Manual Repostings of Revenue | Used in 98% of cases |
KB61 | Enter Reposting of CO Line Items | Used in 98% of cases |
KB63 | Display Reposting of CO Line Items | Used in 98% of cases |
KB64 | Reverse Reposting of CO Line Items | Used in 98% of cases |
KB65 | Enter Indirect Acty Alloc.Reposting: | Used in 98% of cases |
KB66 | Display Indir. Acty Alloc. Reposting | Used in 98% of cases |
KB67 | Reverse IAA Reposting | Used in 98% of cases |
KK87 | Actual settmt: prodn cost collector | Used in 98% of cases |
KK88 | Actual Settlement: Cost Objects | Used in 98% of cases |
KK89 | Actual Settlement: Cost Objects | Used in 98% of cases |
KKAE | Results Analysis: Display Worklist | Used in 98% of cases |
KKAJ | Actual Results Analysis: WBS Elem. | Used in 98% of cases |
KKAS | WIP Calc. for Product Cost Coll. | Used in 98% of cases |
KKF2 | Change CO Production Order | Used in 98% of cases |
KKG1 | Create Cost of Sales: Order | Used in 98% of cases |
KKN1 | Actual Reval.: Cost.Obj. Ind.Pro. | Used in 98% of cases |
KKN2 | Actual Reval.: Cost Obj. Col.Pro. | Used in 98% of cases |
KKPJ | Actual OHead: Cost Obj Collec Proc. | Used in 98% of cases |
KKPZ | Actual Overhead: Cost Obj Individ. | Used in 98% of cases |
KKS1 | Variances – Product Cost by Lot (C) | Used in 98% of cases |
KKS6 | Variances – Product Cost by Per. (I) | Used in 98% of cases |
KO13 | Display Order Plan (Overall, Year) | Used in 98% of cases |
KON1 | Actual Reval.: Int.Orders Ind.Pro. | Used in 98% of cases |
KON2 | Actual Reval.: Int.Orders Col.Pro. | Used in 98% of cases |
KPSI | CO-CCA Plan Reconciliation | Used in 98% of cases |
KSPI | Iterative Plan Price Calculation | Used in 98% of cases |
KSU1 | Create Actual Assessment | Used in 98% of cases |
KSU2 | Change Actual Assessment | Used in 98% of cases |
KSU3 | Display Actual Assessment | Used in 98% of cases |
KSU5 | Execute Actual Assessment | Used in 98% of cases |
KSU7 | Create Plan Assessment | Used in 98% of cases |
KSU8 | Change Plan Assessment | Used in 98% of cases |
KSU9 | Display Plan Assessment | Used in 98% of cases |
KSUB | Execute Plan Assessment | Used in 98% of cases |
KSW5 | Execute Actual Periodic Reposting | Used in 98% of cases |
KSWB | Execute Plan Periodic Reposting | Used in 98% of cases |
KZZ2 | Maintain Percentage Overhead | Used in 98% of cases |
VAN1 | Actual Reval.: Sales Order | Used in 98% of cases |
CPTA | Actual Template Allocation: Order | Used in 97% of cases |
IME0 | Execute Inv. Program Report | Used in 97% of cases |
KB11N | Enter Manual Repostings of Costs | Used in 97% of cases |
KB13N | Display Manual Repostings of Costs | Used in 97% of cases |
KB15N | Enter Manual Allocations | Used in 97% of cases |
KB16N | Display Manual Allocations | Used in 97% of cases |
KB31N | Enter Statistical Key Figures | Used in 97% of cases |
KEU5 | Perform act. cost-ctr cost transfer | Used in 97% of cases |
KEUB | Perform plan cost-ctr cost transfer | Used in 97% of cases |
KGI2 | Act. Overhead: Int.Order Ind.Pro | Used in 97% of cases |
KKA1 | Order Results Analysis and WIP Calc. | Used in 97% of cases |
KKAI | Actual Results Analysis: Orders | Used in 97% of cases |
KKAK | Actual Results Analysis: Sales Ordrs | Used in 97% of cases |
KKAQ | Display WIP – Collective Processing | Used in 97% of cases |
KKF3 | Display CO Production Order | Used in 97% of cases |
KKS5 | Variances – Product Cost by Per. (C) | Used in 97% of cases |
KO12 | Change Order Plan (Overall, Year) | Used in 97% of cases |
KO22 | Change Order Budget | Used in 97% of cases |
KO88 | Actual Settlement: Order | Used in 97% of cases |
KO9G | Plan Settlement: Internal Orders | Used in 97% of cases |
KOB5 | Orders- Maint. line item settlement | Used in 97% of cases |
PSV2 | Dynamic Business Event Menu | Used in 97% of cases |
QA12 | Change usage decision with history | Used in 97% of cases |
QA14 | Change UD without history | Used in 97% of cases |
VA44 | Actual Overhead: Sales Order | Used in 97% of cases |
VA88 | Actual Settlement: Sales Orders | Used in 97% of cases |
KGI4 | Actual Overhead:Int.Ord. Coll. Proc. | Used in 96% of cases |
KKAO | WIP Calc.: Collective Processing | Used in 96% of cases |
KSOP | CO-OM-ABC: Transfer SOP/LTP | Used in 96% of cases |
QA11 | Record usage decision | Used in 96% of cases |
CO43 | Act. Overhead: Prod.Ordr Col.Pro. | Used in 95% of cases |
CO88 | Act. Settlment: Prod./Process Orders | Used in 95% of cases |
KO23 | Display Order Budget | Used in 95% of cases |
KOSRLIST_OR | Internal Orders: Coll. Displ. SettRu | Used in 94% of cases |
KSPP | Transfer Planning From Logistics | Used in 94% of cases |
KOK2 | Collective Proc. Internal Orders | Used in 78% of cases |
KO04 | Order Manager | Used in 76% of cases |
KO8G | Act. Settlment: Int.-/Maint. Orders | Used in 76% of cases |
KOK3 | Collective Disp. Internal Orders | Used in 75% of cases |
KO01 | Create Internal Order | Used in 74% of cases |
KO02 | Change Order | Used in 73% of cases |
KO03 | Display Internal Order | Used in 70% of cases |