Authorization Object: C_ROUT_MAT

Update Material Master From Routings

Category: Routing

 

Definition

The authorization object is used to control authorization for the
following functions:
Scheduling and updating the material master (mass function)
Updating the material master from the planning file

Click on the objects below, to expand data.

Object Fields

The list below includes the object’s fields, ordered by industry-standard importance:

SAVE_MAT Ind: Update Material Master Directly Filled in 88% of cases
SAVE_TERM Ind: Save Scheduling Results Without User Prompting Filled in 88% of cases
VAGRP Responsible Planner Group/Department Filled in 77% of cases
WERKS Plant Filled in 77% of cases

 

Popularity Statistics

Average popularity of C_ROUT_MAT in roles: 0% (What does this mean?)
Average popularity of C_ROUT_MAT by users: 1% (What does this mean?)

Object C_ROUT_MAT is frequently used by users in the following areas:
BC:Basis Components

Environmental Analysis

1. Common authorization objects used with C_ROUT_MAT:

C_TCLA_BKA Authorization For Class Types Objects appear together in 0% of cases

  2. Appearance of C_ROUT_MAT in T-Codes:

CA97N Material Master Update – New Used in 100% of cases
CA96 Update material master Used in 66% of cases
CA97 Mass scheduling using mat. master Used in 44% of cases

Leave a Reply

Your email address will not be published. Required fields are marked *